Drainage & Infrastructure

 

Water Use

The development will incorporate measures for retaining surface water. Streams, ponds and lakes will be considered as part of the
overall masterplan in order to act as landscape features and ecological habitats. They can also be linked to the recycling of grey water and management of off-site flows.

 

Surface water drainage

The North Cambourne development would discharge surface water to the Ely / Ouse catchment rather than the River Cam, where in the latter case there are flooding problems downstream from Cambourne at local
settlements.


On site retention systems will hold back water from the scheme to ensure that communities to the north are not adversely affected.

 

Foul water drainage

Anglian Water Services (AWS) require the construction of an on-site Terminal Pumping
Station at North Cambourne. This will convey discharged flows to the existing Uttons
Drove Sewerage Treatment Works.


As part of this design solution the treatment works will be upgraded to provide greater
capacity to serve the development.

 

Services

Initial consultations have been undertaken to confirm existing capacity and availability of existing services. The need for any reinforcement and/or diversions will be assessed and identified against the final
scheme proposals. All necessary services are or can be made available.

 

Lake
Solar